Labels and Marking, Yandex (FBS)
Automation: In the "Order Processing" scenario settings, you can enable "Automatic Assembly" to instantly confirm and assemble new orders on the platform with automatic transmission of Chestny ZNAK marking.
Option 1. General Processing (Batch Mode)
-
Order Verification: Go to the "Order List" of the desired store. New shipments arrive in the STARTED status.
-
Filtering: Select orders using filters (by shipment date, period, or status).
-
Marking and Packaging (Chestny ZNAK): For marked items, enter the codes in each order line before distributing them into boxes.
-
Print Labels and Change Status: Choose the desired shipment date in the calendar. The app will generate a single PDF file with all shipment labels, and the system will automatically move these orders to the READY_TO_SHIP status ("Ready for Shipment" / "Awaiting Shipment").
-
Create Acceptance Certificate: Generate and print the final "Acceptance and Transfer Act" for the courier or sorting center.
Option 2. Step-by-Step Processing (For One Order)
-
Open the Order: Click on the desired line in the list.
-
Check Details: Review the "Order Information" tab.
-
Add Marking: If the item is subject to Chestny ZNAK tracking, click on the product line within the order and enter the code for each unit.
-
Pack: Click the "Packaging and Marking" button to transmit the codes to Yandex Market and confirm the assembly.
Cancel Order: If you cannot ship the item, open it and click the "Cancel Order" button.
Step 1. Check Orders
Go to the desired store tab and click the «Orders List» button.
Step 2. Select Orders by Filter
- To find the right shipments, use the filters:
- Last 10 orders.
- By a specific time period.
- By the exact dispatch date.
- By status or a list of specific statuses.
Step 3. Print labels by date
Use this step for mass printing and simultaneously updating orders to the 'Ready for Shipment' status:
Date Selection
In the 'Order Dates' calendar, select the dispatch date (the system will highlight only the days with unfulfilled orders).
Batch Status Update
Enable this option to automatically change the status of all orders processed on this date to 'Ready for Shipment'.
Download PDF
After saving, the system will generate a single PDF document with all shipping labels for the selected date, making it easy to print on a printer.
Step 4. Marking and Packaging
If any items require mandatory tracking under Chestny ZNAK, be sure to enter the marking codes in each row and each order before distributing them into boxes.
Step 5. Transition to the 'Awaiting Shipment' status
If the products do not require mandatory labeling, you can skip manual distribution into boxes — the system will automatically transition them to the 'Ready for Shipment' status at the time of printing the label tape on the selected date.
Step 6. Creating the Acceptance Certificate:
The final step in assembly is generating and printing the final acceptance certificate for the delivery of the completed shipment to the courier or to Yandex Warehouse.